QQ登录

只需一步,快速开始

快捷登录

登录 或者 注册 请先

UG爱好者

查看: 985|回复: 0
打印 上一主题 下一主题

[原创] 一个德国工程师发表的高水平论文,志在解决装配线不同工作站工具的共享

[复制链接]

二级士官

Rank: 2

173

主题

245

帖子

437

积分
跳转到指定楼层
楼主
发表于 2016-3-3 21:27:09 | 只看该作者 |只看大图 回帖奖励 |倒序浏览 |阅读模式
最近看了一篇较高水平的学术论文,一个德国人把一个有六个工作站的装配线抽象成了数学模型,并加上了些许约束,利用自己发明的算法,志在解决不同工作站之间的工具共享问题,以达到装配线的平衡,我对他的数学模型和算法部分进行了整理,由于公式实在太多,就写在word里了,有些公式智能截图了,大家看看吧,挺有意思的。
下面是我整理的东西:

Topic: Real-time administration of tool sharing andbest matching to enhance assembly lines balanceability and flexibility
Flexibility refers tothe ability of the system to increase its throughput (despite dynamic changessuch as disruptions in demand or supply) without utilizing any additionalresources. Moreover, an assembly line is called balanceable, if the overallworkload is (or can be) distributed equally between all workstations.
The real-time,collaborative control mechanism has been adapted and extended to providefeedback to the off-line plan generated and updated continuously using abi-objective mixed-integer programming (BOMIP) model.
Continuous informationsharing and update of the plan, enabled by an effective control mechanism, canimprove the quality of the plan, and mitigate the undesirable influences ofuncertainties on the system’s performance.
The plan includes theexpected cycle time, number of workstations, BM(best matching) between tasksand workstations, and decisions on how and when to share idle tools withbottleneck workstations.
The feedback informationincludes task’ processing times, precedence relations, the upper bounds for thenumber of workstations and cycle time, and the pair wise collaborationefficiency(CE) coefficients between the workstations for TS(tool sharing).





版权声明  
本人声明此帖为本人原创帖,未经允许,不得转载!

有奖推广贴子: 

回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册会员

本版积分规则

 
 
QQ:1359218528
工作时间:
9:00-17:00
 
微信公众号
手机APP
机械社区
微信小程序

手机版|UG爱好者论坛 ( 京ICP备10217105号-2 )    论坛管理员QQ:1359218528

本站信息均由会员发表,不代表本网站立场,如侵犯了您的权利请联系管理员,邮箱:1359218528@qq.com  

Powered by UG爱好者 X3.2  © 2001-2014 Comsenz Inc. GMT+8, 2024-11-27 15:38

返回顶部